Skip to main content
Skip to main content

Division of Student Affairs News

Northeast Hall Move-In - Fall 2017

Residents of Northeast Hall,

We are so excited to have you back at WKU! The staff has been busy the past couple of weeks preparing for your return, and we know this year is going to be amazing!   The current construction of the connecting lobby is still on-going and is scheduled to be complete by fall break.   

The hall is still split into two separate wings, North & East, as follows:

NORTH WING (1579 Normal Street)

  • 1st Floor: Rooms 128-155
  • 2nd Floor: Rooms 228-255
  • 3rd Floor: Rooms 328-355
Use the entrance on Centennial Mall/Keown Plaza

EAST WING (1575 Normal Street)

  • 1st Floor: Rooms 100-127
  • 2nd Floor: Rooms 200-227
  • 3rd Floor: Rooms 300-327

Use the entrance on Normal Street

 

During move-in, there will be signs, staff members, and inflatable Big Reds to guide you to the proper entrance you’ll need to use to move in.


When you arrive on-campus, come into the hall/wing lobby and complete your check-in process BEFORE you begin unloading your car.


As soon as you unload your belongings, please move your car to another parking area to allow others to unload.


Reminder: there is no elevator in either North or East (elevator is included in the new construction, but not yet operational)


Reminder: No equipment (dollies, hand trucks) is provided for move-in, but feel free to bring your own to help get items from your car to the building.

 

If you have any questions or concerns, please contact Northeast Hall Director, Zach Marcum at zachary.marcum@wku.edu.   

 

We are looking forward to a great year with you! 

Categories
All News  Now Viewing Category: All
Police
Student Activities and Organizations
Counseling & Testing Center
Housing & Residence Life
Intercultural Student Engagement Center News
Student Accessibility Resource Center News
Latest Headlines
Northeast Hall Move-In - Fall 2017

Move-in instructions for Northeast Hall for Fall 2017

Construction webcams available to view construction

Construction webcams are now in place so you can watch the progress of Hilltopper Hall and the Southwest and Northeast Hall connectors online: wku.edu/webcams - images are uploaded from 5 am-5 pm.

"New residence hall construction underway at WKU" via Bowling Green Daily News

Early construction on a new residence hall at Western Kentucky University has begun, with the goal of offering students more personal living space with common areas for studying and socializing...

Featured Articles
Construction webcams available to view construction

Construction webcams are now in place so you can watch the progress of Hilltopper Hall and the Southwest and Northeast Hall connectors online: wku.edu/webcams - images are uploaded from 5 am-5 pm.

"New residence hall construction underway at WKU" via Bowling Green Daily News

Early construction on a new residence hall at Western Kentucky University has begun, with the goal of offering students more personal living space with common areas for studying and socializing...

Upcoming Changes to Douglas Keen Hall

Due to the increased demand for female housing, effective Fall 2014, the south tower of Douglas Keen Hall will be converted to female housing.

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view,
download Adobe Acrobat Reader.

Note: documents in Excel format (XLS) require Microsoft Viewer,
download excel.

Note: documents in Word format (DOC) require Microsoft Viewer,
download word.

Note: documents in Powerpoint format (PPT) require Microsoft Viewer,
download powerpoint.

Note: documents in Quicktime Movie format [MOV] require Apple Quicktime,
download quicktime.

 
 Last Modified 2/3/17