Minton Hall Remediation Plan


Contractor

Paul Davis Restoration & Remodeling of Bowling Green KY

 

Target Start Date

November 26, 2018

 

Target Completion Date

January 11, 2019

 

Statement of Work to be Performed

  • Remove and dispose of all existing 24"x24" acoustical ceiling tiles. The ceiling grid will remain in place to be reused.

  • Clean the exposed ceiling grid work with an anti-microbial agent.

  • Remove and dispose of all existing 12"x12" ceilng tile above the acoustical tile. This will leave the original concrete ceiling exposed.

  • Clean the exposed concrete using an anti-microbial agent.

  • Encapsulate exposed concrete and residual glue dots using brush on mold encapsulate which includes anti-microbial agent.

  • Partially disassemble HVAC units and clean the inside of the HVAC cabinet.

  • Clean the coil, cabinet and cabinet lining with an anti-microbial agent.

  • Clean all four walls - including windows - with an anti-microbial agent.

  • Clean surfaces of all furniture - including built in, mobile, bed and mattress - with an anti-microbial agent. For soft upholstered furniture, vacuum with appropriate equipment before using an anti-microbial agent.

  • Clean the floor with an anti-microbial agent.

  • Leave each room clean, orderly and ready for occupancy. (Not including the reinstallation of ceiling tiles)

  • Work Minton Hall from top floor to bottom, leaving the hallways in a clean and orderly condition, including vacuuming the carpet.

 