Smith Stadium Convert Locker Room to Offices

SR12-2580 / 190639

Smith Stadium Convert Locker Rooms into 6 Offices

For this project, currently under construction, walls, floors, lockers, doors, plumbing, ceramic tile, toilet partitions, base and ACT will be demolished and disposed of. The plumbing chase and drains and cap lines (below grade or above ceiling) will be removed.  Existing lockers were removed and saved for future use.  New carpet tiles are to be installed.  A new wall at the Lecture Hall entrance with a new frame and door will be installed.  Walls will be built to divide the offices and all walls will be patched and painted as needed.  The sprinkler system will be re-worked as needed to place it in the center of the ceiling tiles.

 Locker Room Conversion "Before 1"

Smith Stadium Locker Room Conversion

Before Renovation - 1

 

Locker Room Conversion "Before 2"

Smith Stadium Locker Room Conversion

Before Renovation - 2

 

 Locker Room Conversion "Before 3"

Smith Stadium Locker Room Conversion

Before Renovation - 3

     

Locker Room During Construction 1

Smith Stadium Locker Room Conversion

During Construction

 

Locker Room During Construction 2

Smith Stadium Locker Room Conversion

During Construction (2)

     

Project Manager

Alfonso Casana

 

Project Budget

$ 83,646

     
    Return to Renovations Page

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view,
download Adobe Acrobat Reader.

Note: documents in Excel format (XLS) require Microsoft Viewer,
download excel.

Note: documents in Word format (DOC) require Microsoft Viewer,
download word.

Note: documents in Powerpoint format (PPT) require Microsoft Viewer,
download powerpoint.

Note: documents in Quicktime Movie format [MOV] require Apple Quicktime,
download quicktime.

 
 Last Modified 9/25/14