Cherry Hall Limestone Step Repairs

This project involved demolition of damaged step sections; selective demolition/salvage of existing limestone step material; transporting/hauling salvaged limestone to the storage yard at the corner of Forrest Drive and South Way; replacement of 240.5 linear feet of front steps with high quality limestone steps consisting of 6 treads and 6 risers, each 40'1" long, with rounded edges for safety; 250 square feet of cement was poured adjacent to the full length of the steps and control joints were installed as specified.

Cherry Hall Limestone Step Repair "In Progress"

Cherry Hall Limestone Step Repair
"In Progress"

 

Cherry Hall Limestone Step Repair "In Progress (2)"

Cherry Hall Limestone Step Repair
"In Progress (2)"

 

Cherry Hall Completed Limestone Step Repair

Cherry Hall Limestone Step Repair

"Completed"

 

Cherry Hall Completed Limestone Step Repair (2)

Cherry Hall Limestone Step Repair

"Completed (2)"

     

Project Manager

Alfonso Casana

 

Project Budget

$ 30,170.00

     