Skip to main content
Western Kentucky University

Normal Street Lighting Project

Normal Street Lighting Project


Lighting has been upgraded on a section of Normal Street as part of a phased plan to improve both vehicle and pedestrian safety.  The speed limit was reduced to 15 mph and crosswalks and signage were added.

Normal Street Lighting Project
 

Project Manager

Ben Johnson, PE, LEED AP
 

Project Budget

$ 350,000.00

Architect/Engineer

Arnold Consulting
 

Contractors

Bluegrass Electrical
Scott & Ritter
     
    Return to Capital Projects Page

Note: documents in Portable Document Format (PDF) require Adobe Acrobat Reader 5.0 or higher to view,
download Adobe Acrobat Reader.

Note: documents in Excel format (XLS) require Microsoft Viewer,
download excel.

Note: documents in Word format (DOC) require Microsoft Viewer,
download word.

Note: documents in Powerpoint format (PPT) require Microsoft Viewer,
download powerpoint.

Note: documents in Quicktime Movie format [MOV] require Apple Quicktime,
download quicktime.

 
 Last Modified 9/25/14