The Wireless Project:

In July of 2004, Network Computing & Communications began full-scale testing of numerous technologies surrounding wireless networking. Research and testing was performed with the goal of building the wireless network to balance ease of use, security, and flexibility for the WKU community. At the end of this process, we began selecting and installing the products to provide wireless services to the pilot building, Mass Media & Technology Hall, and ultimately to the rest of the campus.

The WKU Wireless Project is an extensive undertaking. Each of the proposed Administrative and Academic buildings require considerable resources for planning and implementation. Working with several campus organizations, we have developed a building schedule that attempts to address everyone's wants and desires. The following table will be continually updated to reflect the current schedule of the project.

Please navigate to the Coverage Mapfor current status of the Wireless project.

Building Location Schedule
Location Initial Survey Cabled Infrastructure Deployed APs Deployed *Service Act.* Post Survey Finalized
Pilot  
MMTH X X X X X X
   
Pre-Project  
TPH X X X X X X
CEBS X X X X X X
DUC X X X X X X
HL X X X X X X
CGC X X X X X X
   
Phase 1  
TCCW X X X X X X
Planetarium X X X X X X
TCNW X X X X X X
GH X X X X X X
CH X X X X X X
SC X X X X X X
AC X X X X X X
FAC X X X X X X
   
Phase 2  
WAB X X X X X X
GLAS X X X X X X
EST X X X X X X
GCC X X X X X -
KL (Visitors Center only) X X X X X X
   
Phase 3  
CAC X X X X X -
POH X X X X X X
IEB X X X X X X
PSI X X X X - -
West Hall Basement X X X X X X
DA X X X X X X
   
Phase 4  
SSB X X X X X X
PHAC X X X X X X
JJH X X X X X X
GWH X X X X X X
STH X - - - - -
   
Phase 5  
CRD (partial coverage) X X X X - -
IC X X X X X X
KL X X X X X X
WSB X X X X X X
HB X X X X X X
Expo Center X X X X X X
Steam Plant X X X X X X
Chiller Plant X X X X X X
Faculty House X X X X X X
   
Outdoor Locations  
Guthrie Tower Plaza X X X X X X
PS II East Side/DUC West Side X X X X X X
Centennial Mosaic X X X X X X
Charles A. Keown Plaza X X X X - -
Centennial Mall X X X X - -
GCC South Side X X X X X -
GH West Lawn X X X X - -
Amphitheatre and Colonnade X X X X X X
DUC East Side X X X X X X
CH North Lawn X X X X X X
TCCW West Side X X X X - -
CH South Lawn X X X X X X
   
Undetermined  
Rock House 1 (Normal Dr.) X X X X X X
Rock House 2 (15th Street) X X X - - -
   
Misc. (These locations were completed through independent projects)  
Erskine House X X X X X X
Alive Center X X X X X X
SC (DELO) X X X X X X
DA (Arena-only) X X X X X X
Doctoral Studies X X X X X X
   
Construction (to be completed based on construction time frames)  
VMH X - - - - -
SS (East Grandstands) X X X X X X
SS (West Grandstands) X X X X X X
CEC X X X X X X
P&T X X X X X X
HS X X X X X X
SC (Expansion) X X X X X X
PB X X X X X X
Snell Hall X X X X X X
CoEd - - - - - -
FSH X X X X X X
CEC (Expansion) X X X X X X
Whitehouse X X X X X X
Greek Village(SAE) X X X X - -
Food Services X X X X X X
Baseball Clubhouse - - - - - -
Chapel - - - - - -
Knicely(Expansion) - - - - - -
   
Dorm (Common, Study and Lobby areas only.)  
BCH X X X X X X
BRH X X X X X X
BLH X X X X X X
DK X X X X X X
GIL X X X X X X
HP X X X X X X
MCH X X X X X X
MCL X X X X X X
MER X X X X X X
MIN X X X X X X
NE X X X X X X
PFT X X X X X X
RHH X X X X X X
SW X X X X X X
ZH X X X X X X
   
Dorm Full Deployment  
BCH X X X X X X
BRH X X X X X X
BLH X X X X X X
DK X X X X X X
GIL X X X X X X
HP X X X X X X
MCH X X X X X X
MCL X X X X X X
MER X X X X X X
MIN X X X X X X
NE X X X X X X
PFT X X X X X X
RHH X X X X X X
SW X X X X X X
ZH X X X X X X
 
*Service activated and available for use at this point*